Property Turnovers

One point of contact from move-out to rent-ready.

Painting, repairs, cleaning coordination, and the final punch list organized around one defined scope and one accountable point of contact.

The workflow

A defined path from keys to completion.

The exact scope depends on property condition, management standards, occupancy, building rules, and whether specialty trades or permits are required.

Intake & Walkthrough

Review the property, current condition, target standard, access arrangements, owner or manager priorities, known damage, and desired timing.

Scope & Estimate

Define the work in writing. Identify expected labor, materials, exclusions, allowances if any, specialty-trade dependencies, and conditions that could change the scope.

Preparation & Removal

Coordinate approved cleanout, debris removal, protection, demolition or removal, and other preparation needed before repairs and finishes can move efficiently.

Repair & Make-Ready Work

Complete the approved repairs, patching, paint preparation, painting, trim, hardware, fixtures, minor carpentry, and other make-ready items in the planned sequence.

Final Detail & Review

Address the agreed punch list, coordinate final cleaning as applicable, review the completed scope, and hand the property back for its next use.

Common turnover work

Built around condition, not a generic package.

Any item is included only when it appears in the approved scope. The list below reflects common turnover categories, not an automatic promise that every item is included.

Walls & Finishes

Drywall patching, wall preparation, touch-up, repainting, trim repair, caulking, and finish corrections.

Doors & Hardware

Door adjustments, lock and hardware replacement, damaged trim, stops, pulls, hinges, and related make-ready items.

Fixtures & Details

Selected non-specialty fixtures, accessories, shelving, minor carpentry, and agreed punch-list replacements.

Flooring-Related Work

Selected repair, removal, preparation, transition, and coordination items depending on the flooring system and project needs.

Cleanout & Debris

Coordination of ordinary abandoned contents and project debris when appropriate to the scope and disposal requirements.

Final Make-Ready

Touch-ups, punch-list completion, cleanup coordination, final condition review, and hand-back preparation.

Built for repeat work

Property managers need a standard that can survive the next unit.

Recurring turnover work improves when both sides understand what “ready” means, how access is handled, what requires approval, how changes are documented, and how exceptions are communicated.

Property Standards

Discuss recurring expectations for paint, hardware, common repair items, finish levels, and hand-back condition.

Access & Communication

Establish key procedures, building rules, authorized contacts, approval paths, and the preferred cadence for updates.

Exceptions & Changes

Units vary. Hidden damage, resident conditions, regulated work, or owner-requested changes should be identified rather than absorbed silently.

Turnover questions

What property teams usually want to know.

The written project scope controls. These answers explain the intended approach.

Can you handle multiple units?

Potentially, yes. Capacity, sequencing, property access, unit condition, and deadline expectations all matter. Recurring programs should be planned around realistic crew capacity and property standards.

Can I send photos instead of scheduling a walkthrough?

Photos are useful for early discussion, but they do not always show hidden damage, access constraints, exact quantities, substrate condition, or specialty-trade needs. Some scopes can be estimated remotely; others should be reviewed in person before final pricing.

Do you guarantee a move-in date?

No date is guaranteed by website content alone. A project schedule depends on the agreed scope, access, material availability, approvals, hidden conditions, specialty trades, permits, and other project-specific factors. Any committed schedule belongs in the written project agreement.

What about pre-1978 apartments?

Work that disturbs painted surfaces in pre-1978 housing may be subject to federal EPA lead-safe Renovation, Repair and Painting requirements. See our compliance page for more information.

Have a vacant unit or property that needs a turn?

Request a Free Turnover Estimate →